Page Image
Scope of Work
Engineering, procurement, construction, testing, commissioning and start-up
Project Description
Page Content
Replacement of F&G/ESD Panel with a new one.
Technical Details
Techinical Data
An integrated F&G / ESD SIL2 System with a RTU cabinet, loose F&G field equipment, PAGA system and an alarm repetition panel, as upgrading of the previous obsolete existing system.