FPSO Tullow T.E.N.

Status: Delivered

Scope of Work

Engineering, procurement, construction, testing, commissioning and start-up

Project Description

​​Chemical and methanol injection systems addressed to FPSO Tullow T.E.N.

Technical Details

The supply includes:

  • N. 6 skid mounted units including structures 
  • N.47 API 675 pumps 
  • N.1 methanol transfer air-driven pump
  • N. 23 storage tanks
  • Instrumentation and accessories.                                                                                    

All wetted parts are AISI 316L and AISI 317L stainless steel material. ​