Karachaganak Onshore Production Wellheads

Status: Delivered

Scope of Work

Engineering, procurement, construction, testing, commissioning and start-up

Project Description

​Remote Terminal Unit RTU systems for onshore Production Wellheads operated by Karachaganak Petroleum Operating B.V.

Technical Details

The scope of supply includes in particular:
- Nr. 30 RTU systems SIL2, installed inside outdoor cabinet, redundant at Controllers, Power supply and Communication Interface levels
- Local Mimic panel installed in each RTU
- 12-hours battery backup power system for emergency condition embedded in each RTU
- F&G and ESD logics for well shutdown in case of confirmed F&G detection.
- Cabinet Wind Stability Analisys
- Loose Xenon Flashing Beacons