Mesaieed Industrial Complex

Status: Delivered

Scope of Work

Engineering, procurement, construction, testing, commissioning and start-up

Project Description

Butene Metering Skid​​

Technical Details

The supply includes: n.1 Butene Metering Skid, composed mainly of n. 2 metering lines each one with n.1 coriolis flow meter, connected to a redundant custody transfer flow computer, pressure and temperature transmitters, upstream and downstream double block and bleed valves.

See related projects