FORES ENGINEERING SECURES MAJOR CONTRACT FOR THE ASSEMBLY OF THE 2.5 MW OFFSHORE ELECTROLYSER AND BALANCE OF PLANT IN THE NORTH SEA
Dutch offshore wind farm developer CrossWind, a joint venture between Shell (80%) and Eneco (20%), has awarded Fores Engineering Srl – a subsidiary of the Rosetti Marino Group – a contract for Detailed Engineering, Procurement, Assembly, onshore Yard Integration and Commissioning Assistance of the Electrolyser package. The contract is for the assembly of a 2.5 MW Offshore Electrolyser Package and its associated Balance of Plant (including water treatment plant, hydrogen purification system, and control and telecommunications systems) delivered in collaboration with Elogen.
The package is scheduled for installation in 2024 on the “Base Load Power Hub” (BLPH) platform, currently under construction at the Rosetti Marino construction yard in Marina di Ravenna (Italy). The platform will be completed, tested, and transported offshore by Rosetti for its installation in the CrossWind’s Hollandse Kust Noord wind farm, located 18.5 kilometers off the Dutch coast in the North Sea, by July-August 2025.
More details on the project CLICK HERE.
Press:
- https://hydronews.it/fores-engineering-gruppo-rosetti-marino-fornira-a-crosswind-un-impianto-di-elettrolisi-da-25-mw-destinato-alla-piattaforma-offshore-base-load-power-hub/
- https://www.industrielinqs.nl/waterstof/2024/08/07/crosswind-gunt-contract-offshore-elektrolyser-aan-italiaans-ingenieursbureau/
- https://windpowernl.com/2024/08/06/fores-engineering-contracted-for-crosswinds-baseload-power-hub-electrolyser-assembly/
- https://portoravennanews.com/articolo/3171/Fores-Engineering-Gruppo-Rosetti-commessa-da-Cross-Wind
- https://www.offshorewind.biz/2024/08/08/italian-company-to-assemble-2-5-mw-offshore-electrolyser-for-hollandse-kust-noord-wind-farm/
- https://www.oedigital.com/news/515784-italian-firm-gets-electrolyser-assembly-job-for-dutch-offshore-wind-farm
- https://www.offshore-energy.biz/italian-company-to-assemble-2-5-mw-offshore-electrolyzer-for-hollandse-kust-noord-wind-farm/
- https://epcintel.com/article/fores-engineering-secures-major-contract-for-hollandse-kust-noord-wind-farm-705
- https://fuelcellsworks.com/news/fores-engineering-to-assemble-2-5-mw-offshore-electrolyzer-for-hollandse-kust-noord-wind-farm/